Ops Leak calculator
The figures are filled in for an example 12-person team. Change them to yours.
For each one, how many people do it, and roughly how many hours each of them spends on it in a normal week. A rough number is fine.
Status reports and client updates put together by hand
Chasing approvals and sign-offs across email and chat
Typing the same information into a second tool
Looking for files, briefs and the latest version
Salary plus overheads, divided by the hours people work. If you are not sure, a rough figure is fine.
Your top 3 leaks
The same columns as the audit report. The difference is the fourth one: here every number is your estimate, and in the audit each one is counted from an interview or a recording.
| Workflow | Who | Hours a week | Counted from | Cost a month |
|---|---|---|---|---|
| Looking for files | 12 people | 12 | Your estimate | AED 7,800 |
| Status reports by hand | 3 people | 6 | Your estimate | AED 3,900 |
| Chasing approvals | 2 people | 6 | Your estimate | AED 3,900 |
| Typing it in twice | 2 people | 4 | Your estimate | AED 2,600 |
| The leak | 28 | AED 18,200 | ||
What the audit would count instead
- 01
Looking for files
Counts the searches in a recorded working day, how long each took, and where the file was in the end.
- 02
Status reports by hand
Records one real reporting cycle and counts every person who touches it, and for how long.
- 03
Chasing approvals
Traces a week of approvals through email and chat, and times the waiting as well as the work.
Get this as a PDF
The breakdown on one page, to keep or forward to whoever signs off on tools.
When you want the real number.
The review swaps these estimates for a count. I talk to the people who do the work, watch the costliest workflows run, and price the fix, including when the answer is to keep the tool you have.
One team, with a written report about two weeks after we start.
How the estimate works
- How does the calculator work out the monthly cost?
- Each row is the number of people, times the hours a week each spends on it, times 4.33 weeks a month, times your hourly cost, rounded to the nearest 10. The range it shows is a quarter either side of that figure, because hours remembered from a normal week are rough.
- What counts as busywork in the calculator?
- Four kinds of recurring work: status reports and client updates put together by hand, chasing approvals and sign-offs across email and chat, typing the same information into a second tool, and looking for files, briefs and the latest version.
- Which currencies can I use?
- Dirhams, US dollars and pounds. The hourly cost starts at 150 dirhams, 40 dollars or 35 pounds; change it to what an hour of your team really costs, including overheads.
- Do I have to give my email to see the result?
- No. The estimate shows on the page as you type. An email only gets you the same breakdown as a PDF.
- What if the number is large?
- Then it is worth counting properly. My operations review measures the real hours for one team and its costliest workflows, and ends with a written report about two weeks after kickoff.